Budda
Axe-Master
Nice, but how that all pack up and set up?
Looks like you've got a small rack, FRFR, and pedal, all separate pieces that need to packed and wired in. Plus an FRFR, unless that's an IEM setup in the bottom of the rack, which wouldn't apply to me, at least for now.
That should be a 3m setup assuming the player knows their place on stage and where required hydro is located.
My last touring band had a 4pc kit, 4 guitar amps, 1 bass stack, 2 pedalboards lights and a banner ready to go in 5-10m between 3 people. Anything guitar-amp-board should take under 5 minutes.